您是否需要安装的太阳能电池板需要计划许可?
2021年1月22日
All the following conditions must be observed:1.Stand-alone solar equipment should be sited, so far as is practicable, to minimise its effect on the amenity of the area.2.When no longer needed equipment should be removed as soon as reasonably practicable.3.In terms of solar ground mounting system, the new planning conditions also mean that installations of up to nine square metres will not require...